Layout changes to increase capacity by 45%

Virtual Manufacturing personnel was responsible for the layout with the machine moving and installation (all processes, equipment, logistics and public spaces).

We have prepared, moved and installed machine tools and assembly lines on an already utilized existing space of 25,000m2.

  • Area reduction by -16%.
  • 110machine moves were performed.
  • 30 new machines as well as four new complete assembly liner.
  • Introduction of DS DraftSight.
  • 10production technicians were trained.